Monday, December 20, 2010

little fix

so i am going to do this a little diffrent then i stated before. i am going to 6-10 table for now until i can get to .5-1nl. and use a little aggressive br managment of 30 BI's per lvl. once i get a little higher and my br grows i will add tables as i see fit.
as for the rest of the challange about the bike, well i put together a little list of some of the stuff that i will need. its more of the big to medium ticket items. I will be building most of it from scratch. but stuff like the motor and shit, well that will be off the shelf. Stuff like the frame i will buy the frame from a dealer, then cut it to pieces. (frames come with a registration number) that way it saves the hassle trying to register it. tanks well be made by me from sheet steel, so prices will be estimate for bungs, and filler caps and etc.

Bike Parts
-Motor/tranny/Belt Drive. 8k
-Frame 1k
-Tanks .3k
-Wheels/Tires 3k
-Electrical Stuff 1k
-Controls 1k
-Seat .3k
-Fenders .3k
-Front End 1.8k
-Brakes, Sprockets, etc 2.1k
-Misc up to 4k

i have all the tools needed to do this, as i have built one bike before. the prices could be WAY off, i budgeted high. My friend in Nashville can hook me up with some nice prices.

No comments:

Post a Comment